Let’s talk
Tell us about your project. Schedule your meeting.
You could be our next client.
Hello!
It’s great to have you here.
1 Form Gönder
2 Toplantı Oluştur
Have you planned a budget for this project?
Thanks!
We will contact you as soon as possible.😊

EgeYapı

Ege yapı has been completely
redeveloped. Now more manageable
and more marketable
Catalog No: PKP-006
Sektör: Construction, Real Estate Development
Kapsam: Frontend Application, CMS Integration, Performance Optimization
Proje Duration: 2 Months
Format: 12” LP • 33⅓ RPM • Stereo
Matrix: PKP-006-A / PKP-006-B
Made in Türkiye • ℗ & © Pikap Records 2026
EgeYapı for

What did we solve?

Ege Yapı’s new design language projects created a strong visual framework; however, for this design to become usable at an institutional scale, dynamic, and technically consistent infrastructure, the architecture needed to be redesigned. The project cards, information blocks, galleries, and slider structure behave inconsistently across devices; the adjustments made on the CMS side are not fully reflected in the interface, and the project addition processes were causing delays.

Therefore, all components in the design were re-implemented with a modular system. Interface performance was improved, content flow was simplified, and CMS configuration was enhanced. Thus, Ege Yapı’s project presentation infrastructure became more responsive, more stable, and easier to manage in the long term.

Services & Scope

Frontend Development
Project pages, card components, grid and gallery structures were re-coded with modular logic. All interface components were optimized to work smoothly across different devices.

 

CMS Customization
Dynamic fields were arranged to facilitate easy addition of project content through the panel. Broken structures between the management panel and the interface were fixed.

 

Performance Optimization
Images were compressed, script loads were reduced, lazy-load logic was implemented. Page load speeds were significantly improved.

 

Technical Stabilization
Galleries, sliders, block structures, and form components were reorganized to ensure a consistent, stable technical rhythm.

Değer Katmanı

Modular structure accelerated the project presentation process and stabilized the technical flow. A more organized content flow made the site manageable and sustainable.

This work transformed Ege Yapı’s visual design into a technically robust, fast, and livable project presentation system. The modular infrastructure accelerated content updates and reduced the platform’s long-term maintenance costs. Performance improvements enhanced the user experience, and the site now presents Ege Yapı’s projects in a more professional and smoother manner.

Effect

Within 6 Months

Support Duration -100%

Joint Expert Evaluation

Mansur Atik – Technical Architect
Ahmet Sağırlı – Fullstack Developer
Tolga Çakır – Frontend Developer

The most important need in corporate project presentation systems; the flawless operation of the interface, CMS, and performance layers. What we did at Ege Yapı was exactly that: to make the technical infrastructure modular without disrupting the visual integrity of the design. This approach both accelerated content flow and eliminated inconsistencies in the interface, ensuring the long-term stable operation of the system. The achieved speed and scalability made a direct difference in the real project presentation experience.

İletişime Geçin